a contractor estimates that he can paint a house in 5 days using 6 men. if he actually uses 5 men for the job, how many days will they take to paint the house?

Respuesta :

Einstein08 Einstein08
  • 01-09-2018
it will take 4 days to paint the house with 5 men
Answer Link
tramserran
tramserran tramserran
  • 01-09-2018

1 house = 6 men x 5 days  = 30 man days

Need 30 man days with only 5 men: 30x = 5 men   →  x = 6

It will take 6 days for 5 men to complete the job.

Answer: 6 days


Answer Link

Otras preguntas

Which of the following is equivalent to sin(3pi/4)
8. Find the area (in terms of π) of a sector that has a central angle of 45° and a radius r = 12in. 12in 9. Two cities are on the same longitude. One is situate
What we’re possible reasons for George to kill lennie in of mice and men
five times the difference between 3/4 and 1/2
What’s the answer for this one
What is the obligate host of the tapeworm (diplydium caninum)?
write me an essay on the struggles beyonce went through as a woman
PLEASE HELP!!! 50 POINTS!!! Graph the image of this figure after a dilation with a scale factor of 2 centered at the origin.​
WILL GIVE BRAINLIEST 200 POINTS Score for Question 4: ___ of 6 points) 4.Use the data from the experiment table Temperature and Time During Change of Phase:
(4ab to the power of 6) (-7a to the power of 2, b to the power of 3) =