​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

A positive charge is placed in an electric field that points west. What direction is the force on the positive particle? I think it is west right.
Which sentence best defines parallel structure at the sentence level? Two or more phrases in a sentence are the same length. Two or more parts of a sentence are
Which ordered pair is a solution of the equation y = 3x? A. (–2, –9) B. (–8, –18) C. (–8, –3) D. (–10, –30)
Why is biography important to art and literature?
Why does the sky changes color? Can you pleaseee explain me how it works? Thanks<3
solve each equation by factoring out the greatest common factor: 3n²+3n=0
whats a birthing center
How did Rome conquer Italy
Two large numbers of the Fibonacci sequence are f50=12,586,269,025 and f51=20,365,011,074. What is the approximate value of the quotient f51/f50
Roman numerals in an outline signify main ideas. true or false