carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

(02.01 MC)When a figure is translated on a coordinate grid, what conclusion can you draw from the pre-image and image?​
The tendency or inclination to sin is called _______ . justification bad habits concupiscence hardship
A driver drives 3 blocks North, 3 blocks east and 3 blocks south. What is the total displacement?​
most coenzyemes are derivatives of​
Simplify Ratios 63 to 21
In The Kite Runner, one reason why Baba is so hard on Amir is that _____. Baba feels guilty about fathering Hassan Baba was once a champion kite flyer
Your child, who is 4 years old, adapts easily to new situations. S/he would probably be classified as “slow-to-warm-up” in temperament. True False .
Which religion was introduced in Japan by the Europeans? 1.christianity2. Buddhism 3. Hinduism 4. Islam
OUR GOAL IS TO COLLECT EMAIL ADDRESSES FROM 60% OF CISTOMERS WHO PURCHASE A PRODUCT
Which word describes an angle with a measure of 98"?A) Obtuse B) Right C)AcuteD) Complementary​