ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Name an element in the third period (row) of the periodic table with one valence electron.
Consider the chemical reaction in equilibrium. H2 + I2 + heat mc006-1.jpg 2HI What will happen to the chemical equilibrium if the temperature of the system is
Which number can be classified as a terminating decimal number? 0.491 0.1257… none of the above
At 16 juana is at an appropriate weight. and likes to eat whatever she wants to whats the best strategy to ensure juannas health?
.........coute ce livre?(comment,quand,combien,quoi)
Why is the following sentence an example of informal language? She's taking us out to eat. A. It is too short to be formal language. B. It talks about an
Complete the sentence with the correct form of the verb tener. El papá y la mamá (tener) dos hijos.
How are spores produced sexually differ from spores produced asexually?
What's the area of a rectangle measuring 13 in. × 12 in.? A. 50 sq. in. B. 25 sq. in. C. 156 sq. in. D. 144 sq. in.
50 42 32 35 41 44 24 46 31 47 36 32 30 44 22 47 31 56 28 37 49 28 42 38 45 mean and median