Tyannah9466 Tyannah9466
  • 04-04-2018
  • Business
contestada

The easiest and cheapest time to alter the information system is in theâ ________ phase.

a. system definition

b. implementation

c. requirements analysis

d. component design

e. system maintenance

Respuesta :

fireflies854 fireflies854
  • 04-04-2018
d or c hope this helps

Answer Link

Otras preguntas

what elements are involved in hydrogen bonding
Simplify. 26 + (–3) ∙ (–8) A. –184 B. –2 C. 2 D. 50
QUICK! Lucy is trying to find a rational number between 3 \8 and 6 \7 . What would help her to find this number? A)Divide 3\ 8 by 6\ 7 . B) Convert 3 \8
What changes were made in Utah during World War 1?
all answers to how to be a smart risk taker
what's an improper fraction
why did farmers follow railroads into the texas frontier
once the delegates determined the three fifths compromise what issue did they tackle next?
What would be most useful to help make a simple compass a nonmetal bar,a round metal can,a small iron nail,or a Quartz needle
A weather balloon has a volume of 52.5 liters at a temperature of 295 K. The balloon is released and rises to an altitude where the temperature is 252 K. How do